Line 6 (Orange) is a planned extension of the São Paulo Metro. When complete, it will be long, with 15 stations,〔 and will link the São Joaquim metro station (Line 1 (Blue)) to the district of Brasilândia. The branch is known as the "Colleges' line" as it will serve many of them along its route (FAAP, PUC-SP and Mackenzie University).〔 ==History== This new line will connect with Line 7 (Ruby) and Line 8 (Diamond) of Companhia Paulista de Trens Metropolitanos (CPTM) and lines Line 1 (Blue), Line 2 (Green) and Line 4 (Yellow) of the metro, linking the Northwest, West, Central, and Southeast regions of São Paulo.,〔(Official Site )〕 totaling 18.4 km in length with 17 stations.〔"Linha 6 do Metrô terá ramal até Brasilândia", Daniel Gonzales, Jornal da Tarde, 5/12/2008, pág. 5A〕 The anticipated demand for this line is 600 thousand passengers per day.〔("Line 6 will arrive in New towns Cachoeirinha and Brasilândia " ),''Government Portal of the State of Sao Paulo,''4/12/2008〕 In 2008 it was predicted that the works would start by 2010, expected to start partial operations in 2012 and full operation by early 2015,〔 but two years later it was expected that the project plans would be finalized only in 2011, with the first stations opening between 2013 and 2014 or as late as 2016, according to some engineers of the Metro.〔 On March 25, 2008, the State Governor and the mayor of São Paulo pledged to deliver the new metro line by 2012.〔"Linha da Freguesia do Ó recebe R$ 75 milhões", Daniel Gonzales, ''Jornal da Tarde'', 27/5/2008, pg. 4A〕 The municipal government gave the State R$ 75 million to fund the preliminary designs for the construction of this line.〔("Serra promete iniciar Linha 6 do Metrô em sua gestão" ),''O Estado de S. Paulo,'' March 25, 2008〕〔("Serra promete iniciar Linha 6 do metrô em sua gestão; obra será entregue em 2012" ),''Uol Notícias'', March 25, 2008〕 In principle, the operation of the line will be the responsibility of the Metro, but there is still the possibility of creating a Public-Private Partnership,〔"Metrô vai ganhar Linha 6 em 2012", Daniel Gonzales, ''Jornal da Tarde'', 26/3/2008, pg. 4A〕 which was eventually confirmed.〔 Currently, the extension of the line between Freguesia do Ó and the São Joaquim is confirmed, providing linkage to Line 1 (Blue) . In a future project, the plan is to extend it to Vila Prudente. At the other end of the line, Governor José Serra announced on December 4, 2008 that there would be two branches leaving Freguesia do Ó toward the periphery of the North Zone, one in Brasilândia beside a bus terminal that is under study by the city, and another in Vila Nova Cachoeirinha in Largo Japonês, next to an existing bus terminal.〔"Linha 6 do Metrô terá ramal até Brasilândia", Daniel Gonzales, ''Jornal da Tarde'', 5/12/2008, pág. 5A〕 It will be the first time that the São Paulo Metro will use a "Y " path, something that already exists in the USA, Europe, Australia〔 and also in other metro systems in Brazil, such as the Brasília Metro. The planning director for Metro, Mark Kassab, explained that there will be a need to change trains at Freguesia do Ó station, because trains will alternate with different destinations across the line.〔 The functional design of the line was released in June 2010 and referred to the expropriation of 350 commercial and residential properties along the line, including the headquarters of samba school Vai-Vai in Bela Vista and a unit of supermarkets in Consolação.〔 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Line 6 (São Paulo Metro)」の詳細全文を読む スポンサード リンク
|